Aloha,
We have discovered that, due to the hot water return line configuration, the hot water pumps are required to be off for the building during the pipe project, M-F, 7 am until 4 pm, and will be restored at the end of each work day.
In an effort to circulate the hot water faster, please run the hot water faucet for a few minutes to allow time for the hot water to circulate throughout the building at the end of each day. The low zone (16th floor and below) cold water will continue to be on from this point forward throughout the day.
We apologize for any confusion this may have created and thank you for your continued patience and cooperation as we continue to explore ways to by-pass and allow for hot water to the low zone units.
T1 DV Line Project Water Shut Off (Revised 10.28.20)
Mahalo,
AOAO Management Staff