PLUMBING REPLACEMENT PART STANDARDS
APPENDIX A
A. PLUMBING:
A.1. WATER PIPING:
- Copper pipe Type L or K Hard Drawn
- Lead free solders – no concealed compression joints.
- All valves to be accessible for servicing.
- All tub, tub/shower and shower valves shall have integral stops.
- All tub, tub/shower and shower valves shall be anchored to building structure.
- Every fixture shall have separate isolation valve.
- Every fixture shall have air chamber except Ice Maker.
- Water supply for icemakers shall be copper 1/4” minimum, may be soft copper, no plastic tubing.
- Saddle valves are not to be used for icemaker connections.
A.2. DRAIN WASTE & VENT MATERIALS
- Cast iron with no hub connection.
- Copper type L with lead free solder joints.
- Galvanized Iron pipe with Durham fittings.
- All transition between dissimilar materials shall be with transition couplings.
- PVC or ABS allowed in certain application and systems. Assure you are meeting all code requirements.
A.3. VALVES AND FAUCETS
- All valves and fittings shall be rated 125 psi or better.
- All tubs, tub/shower and shower valves shall have integral stops and integral balance spools. Balance spools and stops shall be accessible.
- All kitchen, bar, and lavatory faucets shall be 2 handles only.
- All supply connections to faucets shall be with metal connections.
A.4. FIXTURES
- Tubs shall be porcelain, steel, cast iron, americast, or fiberglass.
- Lavatories shall be cast iron, porcelain, steel, molded stone, molded marble or fiberglass.
- All water closets shall be 1.6-gallon flush.
B. FLOORING:
- Wood and Tile shall have proper, per code, underlayer of sound proofing/buffer with minimum sound range of IIC 65 or better.
- Floor covering shall note exceed 5 psf per building live load limitations, as such think marble and/or granite flooring with mortar setting bed is not allowed.
- All flooring must be installed per manufacturers instructions, while meeting the above requirements.